CENTRAL PLANT YARD RAFAL · COSTA BLANCA · VEGA BAJA · MURCIA REA · RERA · CDW
SINCE 1972 · 70+ OWNED MACHINES CIVIL WORKS · COMMERCIAL · PRIVATE
HV/LV POWER · WATER MAINS · SEWERS · TELECOMS · SOLAR PV

Utility Trenching & Septic Tank Installation

High-meterage trench excavation and CE-certified biological septic tank installation in Alicante & Murcia—equipped with asphalt saws, calibrated 30–120 cm buckets, trench shoring, PEHD fusion and compacted reinstatement.

Trenching Capability

  • Bucket widths CALIBRATED 30 TO 120 cm
  • Deep trenches SHORING BOXES & STEEL PLATES
  • Pipe welding IN-HOUSE PEHD BUTT-FUSION
  • Solar track record PLANTS UP TO 270 MW

Exact Trench Widths Minimising Bedding Sand, Concrete and Reinstatement Cost

Digging a cable trench 25 cm wider than specified multiplies sand bedding, concrete encasement and asphalt patching costs across every kilometre. OPINSUR operates wheeled, crawler and mini excavators fitted with calibrated trench buckets and hydraulic breakers for hard caliche.

We deliver turnkey trenching packages for electrical installers, municipal water companies, telecom operators and renewable EPCs across Alicante and Murcia.

Utility & Pipeline Trenching — OPINSUR
Calibrated multi-duct trenching for medium/low-voltage power and fibre networks.
Utility & Pipeline Trenching Alicante & Murcia — OPINSUR
Wheeled excavators and backhoes executing clean urban utility connections.

Full Trenching & Reinstatement Cycle

Stage Technical Specification
1. Asphalt Saw-Cutting & Detection Clean diamond-blade pavement cutting and verification of existing buried crossings.
2. Calibrated Excavation (Soil or Rock) Exact-width trenching from 30 cm telecom micro-trenches up to shored collector trenches over 4 m deep.
3. Sand Bedding & Warning Tape Supply of 0/4 washed sand bed, duct/pipe laying assistance, PEHD butt-fusion and regulatory warning mesh.
4. Layer Compaction & Road Patching Compacted ZA-20 backfill using trench rammers/rollers and steel crossing plates maintaining live traffic.

High-Output Trenching Teams for Solar PV Parks (Up to 270 MW)

Proven fleet capacity to open and reinstate tens of kilometres of MV/LV DC/AC trenches simultaneously under strict EPC milestones.

Technical & Commercial FAQ

Do you supply the bedding sand and ZA-20 backfill material as well?
Yes. We supply 0/4 washed sand, gravel and ZA-20 sub-base directly with our own tipper trucks while evacuating surplus trench spoil.
Do you have road plates and pedestrian bridges for urban street works?
Yes. Our infrastructure store holds heavy steel crossing plates, pedestrian footbridges, New Jersey barriers and municipal safety fencing.
Can you trench through solid limestone or reinforced road slabs?
Yes, every trenching crew carries diamond floor saws and matched hydraulic breakers.
WhatsApp · +34 628 102 657
Call WhatsApp Quote